How much material is being removed from the lake?
The SFLECC removes about 168 cubic yards/hour of silt material. So based on the dredge operating hours averaging 37.17/week from September thru October 2025, an estimated 6,245 cubic yards of silt material (or about 446 standard dump truck loads) have been removed from the lake.
The crew is currently dredging near the Cooper Drive area and will continue into the next few weeks (weather permitting).